Network Tasman provides electricity distribution services to electricity retailers in Nelson Tasman (excluding Nelson City, which is supplied by Nelson Electricity). Network Tasman has an agreement with each retailer for the provision of distributed services.
Prior to 2021, services to all retailers were provided under a Use of System Agreement. These Use of System Agreements were superseded by the regulated Default Distributor Agreement (DDA) in 2021. The DDA has been prepared in accordance with the DDA template regulated by the Electricity Authority. The DDA is also available to all new retailers seeking to operate on our network.
Click the button below to view the current version of the DDA:
Warning: file_get_contents(): SSL operation failed with code 1. OpenSSL Error messages:
error:1416F086:SSL routines:tls_process_server_certificate:certificate verify failed in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 8
Warning: file_get_contents(): Failed to enable crypto in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 8
Warning: file_get_contents(https://ntlazureapis.networktasman.co.nz/json/loadcontrol/getload): failed to open stream: operation failed in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 8
Hot Water Load Control
Warning: file_get_contents(): SSL operation failed with code 1. OpenSSL Error messages:
error:1416F086:SSL routines:tls_process_server_certificate:certificate verify failed in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 6
Warning: file_get_contents(): Failed to enable crypto in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 6
Warning: file_get_contents(https://ntlazureapis.networktasman.co.nz/json/loadcontrol/getload): failed to open stream: operation failed in /var/www/vhosts/networktasman.co.nz/httpdocs/wp-content/plugins/oxygen/component-framework/components/classes/code-block.class.php(133) : eval()'d code on line 6 % @ 8:57 PM
All of Pohara will be affected by a power outage from approximately 1:00 pm this afternoon, to allow for the finishing of repairs to the network following a car vs pole incident in the early hours of this morning. All consumers will have power restored by 2:00 pm. ... See MoreSee Less